Skip to content
Project

Federal Knitting Mills building

The owner of this Ohio City warehouse asked D.W. Ross for an energy-efficient answer to its old steel windows. The answer kept the look of the building, down to the sight lines.

A four-story brick warehouse along the street, large multi-pane windows on every floor, an overpass to the right.
The street side: multi-pane windows on every floor.
Type
Warehouse window replacement
Scope
Thermally broken aluminum windows with low-E, argon-filled glass and a grid applied to the exterior of the glass, matching the original steel windows, supplied
Location
Ohio City, Cleveland, Ohio
The job

Why the steel windows came out, and how the look stayed.

  • What was there

    The building still had its warehouse windows: true individual pieces of glass, each one set in putty, held in a steel framework.

  • The problem

    Steel conducts. The frame carried the cold through to the inside, moisture condensed on the windows, and the condensation was rusting the grid that held the glass.

  • What we supplied

    A thermally broken aluminum system: aluminum inside and out with a break between, so the frame stops carrying the cold. The glass is energy-efficient low-E, argon-filled.

  • Keeping the look

    An insulated unit is one pane, not dozens. So instead of individual pieces of glass, a grid is applied to the exterior surface of the glass to mimic them, with the sight lines kept as close as possible to the originals.

We kept the lines as close as possible to what we had.

Dan Ross, D.W. Ross

D.W. Ross supplied the windows; the contractor doing the work installed them.

Federal Knitting Mills building

Before and after.

Before: the courtyard between two brick warehouse wings, banks of original steel windows in light frames on every floor, the water tower on the roof.
After: the same two wings around the lot, long runs of dark-framed windows with applied grids on three floors, the water tower on the roof.
The courtyard, both wings. Drag the line to compare.
Before: the brick warehouse from the street, original steel windows in light frames across three floors.
After: the brick warehouse along the street, dark-framed windows with applied grids on every floor.
The street side. Drag the line to compare.

Working on something like this?

(216) 631-8080Monday – Friday, 8:00 AM – 4:30 PM3195 West 63rd Street, Cleveland, Ohio 44102